HISTORY Our History

The Story of Kuriki Manufacture Co., Ltd.

For over 50 years since its founding, Kuriki Manufacture Co., Ltd. has specialized in the design and production of architectural hardware and residential accessories.Our bathroom lever handle locks and laundry bar hold a leading share in the market and are highly regarded for their quality and reliability. Every product undergoes rigorous testing to ensure exceptional durability and performance.With our integrated system of in-house development, manufacturing, and sales, as well as cost-efficient production at our factory in China, we continue to respond quickly and flexibly to diverse customer needs.

沿革

April 1948
Founding
– Mitsumori Kuriki founded Kuriki Seisakusho in Katsushika, Tokyo
March 1965
Relocation
– Factory relocated to Shimmeiminami, Adachi, Tokyo
November 1970
– Established as Kuriki Manufacture Co., Ltd.
February 1980
Relocation
– Relocated to Namegata, Ibaraki Prefecture
October 1986
2nd generation
– Kazuo Kuriki appointed as President
June 1999
Quality Enhancement
– Acquired ISO 9001 certification, strengthening quality management
April 2002
Launch of In-House Brand
– Registered the “KURIKI” trademark, launching the company’s own brand
February 2003
Expansion into China
– Established Tianjin Kuriki Home Products Co., Ltd.
April 2008
– Acquired Eco Action 21 certification
January 2009
3rd generation
– Akiyoshi Kuriki appointed as President
October 2009
– Bathroom lock and interior sliding door lock received the Good Design Award
April 2012
– Established Tianjin Kuriki Hui Home Products Trading Co., Ltd.
October 2012
– Smart Door Stop received the Good Design Award
October 2013
– Door Keeper received the Good Design Award
June 2015
Overseas Market Expansion
– Selected for JETRO’s “Export Development Support Program”
September 2018
– Second factory commenced operations
October 2018
– Medium-sized 3D printer installed
July 2020
– Partial transition of factory power to solar self-generation
August 2022
– AED installed
December 2022
– Automatic polishing machine installed
April 2024
– Third factory commenced operations
December 2024
– 3D scanner installed